Wednesday, 5 August 2026

The start of a more relaxed build

Now I have withdrawn fron the Society's Jubilee Challenge, I feel an enormous weight has been lifted off me. There have been corners cut during the build to get the layout to its present state, and no-doubt some of these corners are going to affect the running of the layout. So my intention is to stop any scenic work and concentrate on my locos and rolling stock. Some locos have not been run since I acquired them, which is about five years ago, so they also might need some attention.

So, during August my aim is to convert more P4 locos to DCC, along with converting a couple of RTR locos to P4 and DCC. After which I will give the layout a right good thrashing with running sessions, then any problems that crop up will be ironed out.

Once any issues with the track have been resolved, I'll then turn to making a few rakes of coal wagons that will be used for shunting into and away from the coal sidings, along with supplying the coaling stage. These will then be subjected to a few intensive running sessions, then any problems that crop up will these wagons will be resolved.

Just thought, to run comprehensive running sessions I'll need to construct a few cassettes, so these will also need to be built during the this month.


With six weeks to go

With six weeks to go until Scaleforum, I have regrettable  withdrawn from the Scalefour Societies' Jubilee Challenge. This means Rospeath Lane will not be at Scaleforum this year (2026).

Why have I taken this decision? One word sums it up: fatigue.

Not fatigue from building Rospeath Lane, but fatigue from six months of hormone therapy and having just completed one month of radiotherapy. At my last meeting with my oncologist, it was explained that I could expect my fatigue to increase while my body repairs the healthy cells that have been damaged by the radiotherapy. She added that this increased level of fatigue could last for between two and six weeks.

Knowing what still needs to be done to the layout before Scaleforum would be a challenge for a fit version of me. I've realised that any increase in fatigue would leave me with little chance of presenting the layout in a condition I'd be happy with. I'd also be rushing and cutting corners to get it ready for Scaleforum, which would not be good for the future of the layout.

By withdrawing from the Challenge, I've given myself some breathing space, not only to allow my body to recover, both physically and mentally, but also to enable me to enjoy completing Rospeath Lane at a more leisurely pace. Withdrawing now also gives the exhibition manager a better chance of finding a replacement layout than if I were to withdraw in four weeks' time.

Rospeath Lane has already received an invitation to Solrail in November 2027. That is now my new target for having the layout in a fully presentable condition.

Saturday, 1 August 2026

The engineers have been on site

The more I considered the proposed alterations to the track plan the more I thought best to do it now rather than in October after Scaleforum. Anyway, as there were no tablets or comments forthcoming to deter me I called in the engineering department.

View from road bridge.

While the engineers were on site they made a start on the road over-bridge, retaining walls with steps down from the road to access the MPD.

Road bridge under construction.

Friday, 26 June 2026

In need of some tablets to stop me doing this...

Very kindly, Neil Smith has built eight Lanarkshire Models buffer stops for Rospeath Lane, one was to be installed on the short stub siding at the front of the layout. Then in September/November, after Scaleforum, this siding was going to be extended to run alongside the running shed. In coming to install this last buffer stop, I realised that in lifting and reinstalling it, the risk of damaging it would be considerable.

I then wondered if I could win enough back of the 18.83 square feet from the scenic area at the front to extend the short stub siding. If so, I'd only need to install the buffer stop once. Unfortunately, the buffer stop would not be seen as it will be hidden behind the left-hand vertical proscenium. It would be a tremendous shame to hide Neil's valued work.

This brings me to why I need those tablets....

While building the layout, I've realised that the slope up to the coaling stage is on the steep side. Must admit this has been pointed out before, but to squeeze it in I had to shorten its length, so increasing the slope. In trials, a Pannier does struggle to push four full 16T minerals up the slope. OK, I could fettle 4 wagons and a loco to overcome this, but I'm becoming more dissatisfied with the look of this slope. The proximity of the coal sidings at a level just below the height of the coaling stage road would, in reality I think, this would mean the coaling stage would have been fed directly from the coal sidings. This alteration was again planned for post Scaleforum.

In making this alteration, it would:

    1) Dramatically reduce the slope up to the coaling stage so remove the need to fettle rolling stock specially for working the Coaling stage.
    2) Allow the coaling stage road, and coal sidings to be operated separately from and not interfere with locomotives accessing or departing.
    3) The current coaling stage turnout could be used to create a short siding for a loco or full ash wagon storage.
    4) Neil's final buffer stop could then be installed where it can be readily seen at the end of this short siding.

This then brings me full circle to what buffer stop to use on the extended siding running alongside the running shed. Well, as Lanarkshire Models buffer stops are not available anymore, I could easily construct a sleeper buffer stop.

If you're confused, the images below should help to explain the rambling description above.


Amended track plan

The above picture shows where the short stub siding currently ends, also the space to the left of the Running Shed that I'm proposing to extend the siding into.


The area hatched pink is the original area that will be painted black, therefore not part of the 18.83 scenic area. Believe it or not, the area hatched blue is roughly the same area that I'm infringing on at the side of the Running Shed.


Above is the more dramatic alteration I'm proposing to do withe the coal sidings and coaling stage road. 

These alterations are still being thought about and do depend on how it might affect the already installed wiring underneath. I realise there will be more wiring to install, including a change to the control panel, which will add to the time these alterations will take. BUT the more I think about it I feel it makes more sense to do these alterations now before I start on scenic contours and detail, rather than in three months time then undoing scenic work I'd completed just for Scaleforum. It may well affect the finished state of the layout for the September exhibition but I feel I'd be a lot happier with how the layout will look and operate.

If no one can supply those tablets to stop me do the above, these alterations may will be a goer me thinks...

Thursday, 18 June 2026

Coaling Stage Staircase

Today I've come back to working on the Coaling Stage and extension beyond. First tacks to completed was installing the railings around the extension. These are Ratio's 144 Hand Railings and work out at around 6' 6" high which when a ModulU figure is placed behind them they do look about the correct height. 

Part painted ModelU figure against the Ratio railings

Which is more than can be said for the staircase supplied with the Coaling Stage kit.....

Staircase as supplied with the kit

Another part of the staircase that doesn't look right is the thickness of the railings.

Amended Staircase

Once I'd removed the existing handrails and reduced the height of the posts, I'd started to replicate the two rails per side. That was until browsing "A Pictorial Record of Great Western Architecture" when I noticed the staircases on the Oxley and Oswestry coaling stages hand only the handrail. I certainly feel it looks a lot better.

Tuesday, 16 June 2026

Runnng Shed doorway

I started to build the Running Shed six years ago and have placed in on and off the layout many times including having Locos in its doorways. In the last few days I've only just noticed how high the doorways are! In looking through my WR Engine Shed books, and especially photos I've taken while visiting Didcot, I'm now seeing this as a problem.


Didcot

It's amazing that I have only just noticed this but how to solve this? It has not helped that I've decided to higher the base of the building my 2 mm so I can install hard standing up to rail hieght within the Running Shed...

It's too late in the construction to reduce the wall height, so I feel my only option is to add more louvres/grilles and then modify the doors to suit. 

I did contemplate cutting out the louvres/grilles from the rear doorways, as these will not be seen, but felt I'd not be able to cut them out without damaging them. So unless I can find some similar louvres its down to drawing some and having them laser cut.

In the meantime I can still continue with building the running shed with completing the roof and offices, installing lights, and also the hard standing within.


Monday, 1 June 2026

15 weeks to go

Only 15 weeks until Scaleforum… Blimey… and I’ve just replied in the positive to the invitation, so I really do need to pull my finger out. Like possibility many entries in the Challenge, I still have much work to do.

Treatment for a health issue is making me very tired and is therefore reducing the time I have available for Rospeath Lane. This has made me realise I'll not be able to achieve all I was hoping before Scaleforum. So, to reduce stress and achieve a presentable model I've decided to delay building the lifting shed and shed office/bothy. These buildings can be a later addition. Also, realistically, I'll not have all the locomotives available to represent my envisage timetable. But with that said, I'm hopeful it will be worth taking to High Wycombe in September.

All track-work is in place with many heatwave induced issues solved and the turntable being installed and working, has made me feel a major milestone has been achieved. This has enabled me to get back to looking at the buildings. The Coaling Stage and surrounding structures being the first. What had been holding me back painting the buildings is how to depict them in the latter days of the steam era. The water tank had also given me an issue, as it would seem that by the 1950s most had corrugated roofs, whereas the Timber Track model looks to represent sheet metal. This made me wonder, I should I replace the roof with corrugated sections or paint it as supplied? The thought of ripping the roof off the water tower, along with everything else I have to do before Scaleforum, did not seem a great idea. This may be something I come back to after September.

Coaling stage building group being painted

It was very easy painting the brickwork in a pristine condition, but to then distress it took some thought and nerve. I think my decision to leave the water tank as supplied in the kit has worked out quite well. I feel they are starting to look how these buildings might have looked in the late 1950s.

Recently I've read that the track beyond the coaling stage would have been on a slight slope. This was to allow the coaling stage staff to roll the full wagons under gravity into the coaling stage. Hmm...a cunning plan has formed in my grey cells….so a slight slope has been added on top of the brick extension.

Little old me

There are a few minor details to add before installing these buildings on the layout. Primarily, paint myself along with the coal tubs for me to push. This is a cameo I thought would help to add a little life to the coaling stage. A couple of years ago, on a trip down to Wales,  I popped into Modelu on the way home. 

Other remaining details that need adding are a few coal heaps within the coaling stage, install railings along the brick extension, construct the water tank access ladder and add the water tank vents. I may also add some guttering and downpipes to the coaling shelter... All that will then remain to to do is to lay the track, and ballast before embedding the building in position within the layout.

I'll then continue constructing the Running shed.

Wednesday, 1 April 2026

Turntable - Bench Test

Well, I'm in shock...the MERG turntable kit i've built works first time...it will be installed in postion on the layout during the next couple  days.



Monday, 30 March 2026

Slow progress

Progress has been slow during the last few months. This is because of a number of reasons, one of which has been my poor track building, including chasing my tail with wiring problems. In the past, until testing Rospeath Lane's track, I have enjoyed building track but because of the time constraints for this challenge, I think I didn't take enough care in its construction. It has taken much time to correct all the tight spots through the turnouts and even with some sections of the plain track along with infuriating wiring problems. On more than one occasion, I even considered ripping all the track up and starting again... The phrase "more haste, less speed" comes to mind...

However, eventually I converted two locomotives to DCC with P4 drop-in wheels to test the track. My thinking is if these two locos can navigate the turnouts and plain rack, compensated locos should not have too much of a problem running on the layout.Well, that is my theory.

Coal storage sidings

Coaling stage and ash pit tracks

Running shed tracks

Track running through the coaling stage and onto the extension beyond is still to be installed. The delay here is I have been contemplating installing lighting and thought this would be easier on the bench than when the buildings are in position on the layout.

As far as DCOs are concerned, I've installed one which is working well apart from the LED on the control panel. This small issue needs to be solved before I complete the rest.

The next major hurdle is installing the turntable. I have built the MERG control board and it's passed the first electrical tests. Bench testing needs to be completed with the stepper motor and switches before installing within the turntable well.

Tuesday, 27 January 2026

Scalefour Jubilee Weekend

On receiving the latest Scalefour News and reading what is on offer over the Jubilee Weekend, and knowing I have much to learn, there are many Learning Skills demonstrations I'll benefit from.


The ones that stand out for me are; 2D CAD, 3D with Fusion360, DCC Chip fitting, Painting figures, Painting & lining, Painting & weathering, Soldering, Making a loco chassis, CSB, Springing wagons, Oh, and possibly making use of the test track to see if how some of my locos perform. That was from just looking at the index so no doubt when I read the article fully there will be others.

Then, of course, there is the "eye candy"... OK, I've seen many of the layouts before, but there is always some element that is worth noting again or even elements not previously seen.

Anyway, as I don't think one day will do the visit justice, I've booked a room at the Conference Centre (Friday - Sunday).

Really looking forward to the weekend.

Sunday, 11 January 2026

The start of another year

2025 seemed to pass in no time.

Rospeath Lane is drifting further behind the schedule I've set myself. That said, I'm still making steady progress. Some wise person said "You can't smell the roses from a galloping horse" or something like that. Well, I'm not actually smelling roses, but I am enjoying taking my time constructing this layout with all it's (new to me) technological challenges.

The hope was to have power to the track along with some turnouts operational by the end of 2025. Well I achieved part of this milestone this week and had a loco moving on parts on the layout. At the time I there were no turnouts operational, this is the task I'm currently prioritising.

Underneath the Running Shed board
Underneath the board with the control panel
Starting on the wiring within the control panel. 
Hope to tidy up that mess of wiring a little once all the wiring is installed.

Control panel 

In the last photo, three yard lamps are just visible. I was considering installing these at this stage, especially as the boards are spending much time upside down. I then felt they might be a too fragile to be installed at this stage as they could be damaged especially during track ballasting. The transport end panels have been installed, this is so the boards can be turned upside down on the floor, making it easier to install the wiring.

I've also constructed one of MERG's District Cutout kits It passed the first round of tests, but unfortunately, it didn't cut power to my test track before the NCE Power Cab cut out. The local MERG group suggested a fix, which I've not implemented yet. At this time of the build, I thought progressing with getting all the wiring in place and turnouts working was more important. I've allowed for installing the DCOs at a later date.

MERG's District Cutout board

Someone suggested to me that DCC wiring is not as complex as the wiring required for a DC layout. I must be missing something...

Thursday, 20 November 2025

An excess of water

A week ago I awoke to a slow drip of water landing on my pillow. I did wake a couple of time in the night noticing a damp pillow, only to past it off to a bad case of the night time dribbles. On rushing downstairs to grab a set of step ladder to check what was happening in the roof I walked into a small stream in the hallway. This was not coming through the ceiling but the front door...

This was surprising as we are not next to a river or stream. I suppose still being half awake, it was still dark and not thinking through what the consequences might be, I open the front door. A small wall of water greeted me and I very sharply slammed the door shut. The door seals were doing an excellent job of holding most of the water back. On looking out I could see that the water was above floor level of the log cabin that is my Man Cave/Railway room.

The water had drain away by mid-morning but left us mopping up in the house and surveying the damage to the Man Cave. The carpet in the Man Cave was like a sponge, and anything that was on the floor and not in a plastic box was also sodden. During the next couple of days, a neighbour and I emptied the contents of the Man Cave into the neighbour's shed. We removed the sodden carpet. I bought a dehumidifier, set it up, and then left it running all week, emptying plenty of water each day. I'll be keeping it running all winter.

All now seems relatively dry so I've started to move stuff back into the log cabin. On the plus-side I'm taking the chance to sort thought and decide what needs selling or throwing away and luckily, nothing of great value has been damaged. On the downside I have lost valuable time on the Rospeath Lane build. 

Oh well I've still just over nine months to catch up...

Wednesday, 5 November 2025

Installing the wiring

I've had few thoughts about the wiring for the new incarnation of Rospeath Lane. It is a much reduced track plane compared to the original but it will be an exhibition layout which I doubt the previous one would have been. So in an attempt to reduce the possibility of not being able to solve a short circuit quickly during an exhibition, rendering the whole inactive, I've split the track plan into five power districts.

So far I have all rail power droppers in place along with all turnouts droppers. As a trial I decided on installing the first rail dropper to power bus connection on the left hand cassette board. 

Needs a little tidying up but that is the template I'll be using for the rest of the layout

The wiring I'm using are32/0.2 (22 AWG) for the droppers which I believe is rated at 3 amps and 32/0.2 (17 AWG) .for the power bus which I believe is rated at 6 amps. These might be ratings might be overkill but I'm learning as I go along.

Though my diagram above indicates one "common return" for all power districts, I'm contemplating if this might hinder solving a difficult to find short circuit so may well keep the districts totally separate. As I said, I'm trying to learn and evaluate many options as much as I can while progressing with this project.

Tuesday, 28 October 2025

All trackwork laid

At last, all track laid in place, with turnout wiring installed and a start made on installing power droppers to the rest of the track. The only section not fully in place is the coaling road approach to the turntable. My thought is to lay this in place once the turntable is working to help get the track aligned correctly with the turntable's rotational steps (if that makes sense?).


That said I've also been working on a design for the Shed Offices. A little off-the-cuff design with an attempt to come up with a building that looks and feels along with complementing the Timber Tracks Buildings. In discussions its construction there has been a suggestion that it is laser cut rather than built using plasticard. A laser cut building should be a better fit with the other buildings.

Initial design 

I've not drawn a plan of a building before let alone one for laser cutting so have much to learn. On another duplicate drawing I've started to create a brick pattern and colour the cut lines blue and etch lines red. The windows have been drawn to match the etched windows available from London Road Models. At the moment I'm unsure whether to etched windows or use laser cut ones but will have the option to use either.

The whole layout was being built on top of some Ikea Ivar shelving units which were also being used for storage. While this has been convenient I started to think this is was not ideal especially as there was no convenient access underneath the layout without moving the boards elsewhere. Thinking it would be better to complete the build on its own support structure I spent last weekend reorganising the 'Man Cave. Rospeath Lane is now self-supporting, giving access underneath. This should also help with ironing out any issues with the supports as far as stability and construction.

Rospeath Lane's current state

What helped in the reorganising of the Man Cave is my decision to scrap Heath End, the roundy-roundy P4 layout that I acquired. In re-evaluating what would be involved correcting baseboard alignments, improving the wiring and bring the scenic areas up to a standard I would be happy with,it would distract me from what I'd really like to achieve over the next few years. On top of that it did fill one end of the Man Cave making it a tad awkward to access and making the room look untidy.

What do I want to achieve in the next few years?

The primary objective is of course completeing Rospeath Lane. 

In hindsight I might have been a litttle hasty thinking about scrapping Tredethy Wharf. I’ve had many comments that I should not scrap Tredethy Wharf. Including a a lady who went out of her way to let me know she'd voted it best in show at Scalefour Crewe 2024. Having it out on display with give me the opportunity to evaluate my feelings for the layout and where I can improve the scenic area. Before I can exhibited it again there will have to be new cassette boards along with transport case and lighting boxes in the same style as those built for Rospeath Lane.

Tredethy Wharf now on top of the Ivar shelving units

I purchased the EM gauge Fiddlers Wharf layout from Paul Gregory earlier in this year. It’s a slight twist on the Inglenook Sidings Shunting Puzzle track plan. Having really enjoyed operating Gordon Luck's P4 Dock Road layout at a number of  exhibitions I can envisge getting the same enjoyment out of this layout. It is a layout that can bring hours of quiet enjoyment at home but also at exhibitions for the public to operate solving the puzzle. My intention is to, again, construct an enclosed transport, lighting box along with converting it to being operated from the front. Having this layout on display will help with these tasks.

Fiddlers Wharf also on Ivar shelving units

Finally I come to what will possible be my final project, Boscarne Junction.The desire is still there to build this layout. Whether it will be permanently fix in the ‘Man Cave’ or exhibitable remains to be seen.

I'm a little behind schedule with Rospeath Lane but should still have locos moving around the shed by Christmas...

Thursday, 21 August 2025

Sad News

I received some very sad and unexpected news today: Allan Smith passed away yesterday morning.

This is very upsetting news. My wife and I visited him only a few weeks ago. When we left, he said he was looking forward to seeing Rospeath Lane at a show sometime, along with his locomotives he'd converted running once more.

I had only known him for a few years, but I quickly recognized that he was one of the good guys—unassuming, generous, and always willing to share his passion for model railways with a novice Scalefour member like myself. I have benefited immensely from the short time I knew him, and I only wish I had known him longer.

RIP Allan. Rest assured, your locomotives will be well cared for and given a new life on Rospeath Lane.

Monday, 21 July 2025

12th July - Darlington

A little late posting this entry, as we hosted our first full-on Writer’s Retreat at Longthwaite the following weekend. Much time spent cooking, baking and getting the house ready for the six people attending. After all the effort we received very positive feedback and all six want to return.

Anyway back to the main subjet of this blog...

I'd not achieved all I had intended to complete for the Scalefour Society AGM but at least some progress has been made. Eleven turnout were constructed, the hope was to have them all installed unfortunately only five along with the trap at the bottom of the coaling stage road were in place. I'd also rushed laying some of the plain track which on inspecting some sections need to be improved. In hindsight the deadline of the AGM was a big incentive which resulted in many steps forward with possibly, due to rushing, only one backwards.

At the AGM there were four other layouts, all worth seeing in their own right. It was good to see Richard Spratt's Challenge entry, The Bridge, and to understand the insperation and thought process behind the project. Another layout under construction was part of Rob Ward's model of Whitby. This is one layout that we might not get to see again due it it really being designed as home layout. I'd seen Duncan Willcox's Croft Bank and Chris Michell's West end before but there's always an unseen detail to catch the eye.

I was initially concerned about the just-under-two-hour trek to Darlington for a one-day show. But meeting some Society members for the first time, catching up with others, receiving encouragement for Rospeath Lane, getting help from Neil Smith with setting up and dismantling the layout, and once again proving that it all fits in the car with Neil as a passenger — all made it a very worthwhile day out.

All set up 

View from the back.
Did wonder if this is a better view of the layout
rather than from the front...?


Friday, 23 May 2025

A break from turnouts

Today may have been the last guaranteed day of  no rain for sometime. With this in mind, I decided to to erect the layout outside and look at solving two issues with the setup  that surfaced at Workington.

  • First being why the the support beams sagged at one end
  • Second is to solve the sagging top and pelmet

I'm hopeful that I've solved both. The beams seemed to be OK, so don't know why they sagged at one end at the Workington show...but I did tighten some connections. The addition of the cantilever cable has definitely helped with the sagging top/pelmet.

It's been an excellent exercise erecting the layout in its exhibition format again. Has given m chance to hone my skill in putting it all together. While I continue with constructing the track, I now have to give some thought to the back screen. Not just to which material to use but how easy or difficult it will be to hang it from the rear pelmet. Besides the back screen, there is the lighting to consider...

Tuesday, 13 May 2025

Stuttering progress with track construction

Progress with track building has been very slow, in fact, almost none existent. Many other household tasks seem to have taken priority. Then, I realised the Scalefour Societies AGM in Darlington is fast approaching, and Rospeath Lane is booked to attend. In the last couple of weeks, this has given a little impetus to get more done.

I purchased and built two more FineTrax turnout kits to save time. I'll use these at the back of the layout for coal sidings. Again, as an attempt to save more time I purchased six 1:6 Vs off the Societies Forum sales. I'm not sure this has saved any time because the Vs have been built slightly tight and I've had to try to bring them back to correct tolerance and I'm note sure how successful I've been.

State of play on 7/5/2025
As I write this post I'm down in Hove. After being offered free accommodation in a flat for a week it would have been rude not to accept. When on holiday my wife likes to spend some of her time continuing with her writing, this allows me to spending time on hobbies. So I brought a partly built turnout and enough components to build a couple more to Hove. A good result would be to take home the part built turnout completed and another well on the way to be finished, anything else will be a bonus.

My intention was to have all the track laid down with droppers in place for July 12th. After which I could start to get my head around the wiring for the servos and DCC. What is now more likely to happen is what track I have constructed will be just laid in position. There area few more weeksto go so we'll see...

While I'm in Hove I took the opportunity to visit the EM Gauge show in Bracknall. It's a show I've always wanting to visit but is normally too far for me to travel to for just a one day visit. Hove being just over an hour away made the opportunity too good not to miss. Really glad I made the effort as well; it was a very good event, all layouts to an excellent inspirational standard, also good trade support. The MERG stand was staffed by two informative gentlemen giving me an inscentive to make better use of my membership. There were also a good selection of demonstrators covering almost all aspects of the hobby. The 3D software demo was very informative. 

I went with the intention of making a purchase from Squires of two files which was duly done. I'd also promised myself  I wouldn't succumb to my habit buying books but temptation got the better of me and a purchase was made from the GWR Study Group. This is their book on GWR Structure Colours 1912-1947.

Looks to be an excellent source of information
I noted many variations in the colors used on buildings and structures at different GWR preservation sites, and also how those colors were applied. This has made me confused as to how I should portray the buildings on Rospeath Lane. I'm hoping this book should shed some light on the subject and give me guidance to what colour scheme might be appropriate and justified.


Sunday, 16 February 2025

FinetraX P4 A6 Turnout Kit


Just being inquisitive, at Scaleforum last year (2024) I purchased one of FinetraX's A6 turnout kits marketed through the Scalefour stores. On Rospeath Lane, there is one off-scene turnout within Cassette Board Two. My thought was that if this plastic turnout kit came together well but didn’t look as good as the plywood-built turnouts, I could use it on Cassette Board Two. If, on the other hand, I make a 'pig’s ear' of it, then I'll have to build a plywood or copperclad replacement.

On first inspection, it didn't look too bad. The crossing V is not assembled, which, for the price of the kit, I shouldn't have been surprised. The switch blades look very reasonable and the moulding of sleepers and chairs looked nice and crisp. I began working on it.

Being impetuous, I installed the stock rails first… then quickly realised I had no idea how to build the V. At this point I did what I should have done at the start and downloaded the instructions off British Finescale's website. The instructions are excellent running to thirteen A4 pages including many explanatory images. They walk you through each step of constructing the turnout, simply and effectively.  Unfortunatelly, as these P4 kits are not available direct from British Finescale, nor is the appropriate template. Instead I downloaded the EM gauge version as a guide.

The first step is to construct the V, followed by the check rails. Both tasks require cutting one of the three rails to the required lengths, adding slight bends where needed, and threading them through the chairs on the base. I had slight difficulty in getting the knuckle of the V in the correct place on the base. Eventually, after a little fettling, everything fell into place.

The  FinetraX P4 A6 turnout after 1 hours construction along side a  GWR old-type 15ft heeled switch 1:6 turnout under construction.

Before installing the stock rails, two pins are pushed through the supplied tie bar and placed on the base. The stock rails are then threaded through the chairs, making sure they go over the tie bar. At this juncture in the build, with only the switchblades to install, I realised it had taken me less than one hour to put it together.

Later the following day I found a spare few minutes to continue. That is all it took to fire up the soldering iron, trimmed the switchblades to the correct length before fixing them to the tie bar with a spot of solder. Job done, turnout complete.

I have heard/read negative comments about the tie bar included in the kit. In my opinion, for someone who is new to Scalefour, nervous about building their own track, the tie bar is simple and works. For more experienced modellers who have constructed their own track, it will not be a problem to use a tie bar of their choice.

It's a shame I didn't accurately record how long it took to construct this turnout. At most, I think it took just over two hours, including downloading and reading through the instructions, then searching for and finding the EM gauge template.

In my opinion these kits are an excellent option for someone who would like to try their hand at P4 but put off due to having to construct turnouts. Currently, there are only four kits available through the Scalefour stores: left and right A6, left and right B7.

Complete P4 A6 turnout alongside an EM Guage A5 template

Unlike EM gauge turnouts, which can be purchased directly from British Finescale—allowing someone to try before committing to the EM Gauge Society—P4 versions require joining the Scalefour Society or finding a show where the Scalefour Society’s trade stand is present. This raises the question: is the Society missing an opportunity to attract newcomers, or is this simply the result of a commercial agreement with British Finescale?

Friday, 31 January 2025

First turnout

It's taken me far too long to complete this turnout, I just lost my way a little over the last couple of months. What spurred me on to get it completed it is setting a deadline of the end of January to have it installed. The hope was also to have it installed complete with turnout operating unit...


Well, it's not installed as yet but I'm pleased that it is finished and looking OK when laid in position on the layout.

On my previous layout, Tredethy Wharf, I didn't build any turnout with Stretcher Bars. I think as it was my first time constructing P4 track I didn't what to complicate the build any more than I had to. I was just please the turnouts came out OK without them. Don't think I received any verbal comments them being missing either. Since then I've promised myself that any subsequent turnout I build will have included them. I'd researched a few different solutions and thought Masokits looked good. Though marketed by Masokits as tiebars, I believe they are stretcher bars, but what do I know....


The instructions are very easy to follow, I especially liked the comment "Luvverly 'inin't", it made me smile.

In case anyone is wondering, the grey slide chairs I've used on the turnout are GWR 2 bolt chairs available from Modelu.

So, I have just ten 1:6 turnouts left to build. I've set myself the difficult target of early July to have them all built with some installed. A bit of a tall order but it needs to be done if the September deadline is to be met.